I have a vNext release that is triggered by a gated check-in build. The associated changeset is linked with an work item.
What I have to check in order to have the linked work item displayed in the Change Summary tab of the release as in this link?
I have a vNext release that is triggered by a gated check-in build. The associated changeset is linked with an work item.
What I have to check in order to have the linked work item displayed in the Change Summary tab of the release as in this link?
© 2022 - 2024 — McMap. All rights reserved.